How To Fix FM_BP_DRF019 - Sending request for Budget Period &1 was successful


FM_BP_DRF019 - Overview

  • Message type: E = Error

  • Message class: FM_BP_DRF - Message class for Budget Period Replication

  • Message number: 019

  • Message text: Sending request for Budget Period &1 was successful

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FM_BP_DRF019 - Details

  • The SAP error message FM_BP_DRF019 indicates that a request for a budget period was successfully sent, but it may not necessarily mean that the budget was successfully processed or that there are no issues. This message is typically related to the Budget Control System (BCS) in SAP, which is used for managing budgets and financial planning.
    
    Cause: Successful Request: The message indicates that the request to send budget data for a specific budget period was successful. However, it may not provide information about the subsequent processing of that request. Data Issues: There could be issues with the data being sent, such as incorrect budget amounts, missing information, or inconsistencies in the budget period.
    Configuration Issues: There may be configuration settings in the BCS that need to be reviewed or adjusted. Integration Issues: If the budget data is being sent to another system or module, there may be integration issues that need to be addressed.
    Solution: Check the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FM_BP_DRF019 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker