How To Fix FINS_SIS_CUST112 - Preparations must be set to completed before this activity can be run


FINS_SIS_CUST112 - Overview

  • Message type: E = Error

  • Message class: FINS_SIS_CUST - Impl. of Doc. Splitting: Customizing

  • Message number: 112

  • Message text: Preparations must be set to completed before this activity can be run

  • Show details Hide details
  • What causes this issue?

    Activities of a project can only be run if the preparatory phase for the
    project has been completed. To complete the preparatory phase, you must
    manually change the project status and set the preparations to
    completed.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    You can check and change the current project status in the Customizing
    activity
    <DS:SIMG.FINS_MPROJ_RELEAS_06>Complete Preparations</>.
    After you have manually set the preparations to completed, you can try
    to perform the operation again.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


FINS_SIS_CUST112 - Details

  • The SAP error message FINS_SIS_CUST112 indicates that certain preparatory steps must be completed before you can execute a specific activity in the system. This error typically arises in the context of the SAP Financial Information System (FIS) or similar modules where certain prerequisites must be fulfilled before proceeding with a transaction or report.
    
    Cause: The error usually occurs due to one or more of the following reasons: Incomplete Configuration: The necessary configuration settings for the financial information system or the specific report you are trying to run have not been completed. Missing Data: Required master data or transactional data may not be available or may not have been processed correctly. Process Steps Not Completed: Certain process steps that need to be completed before running the activity have not been finalized. This could include tasks like data extraction, data preparation, or other prerequisite activities.
    Solution: To resolve the error, you can take the following steps: Check Configuration Settings: Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FINS_SIS_CUST112 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker