How To Fix FINS_FI_SIF109 - Company code &1 is not assigned to an active project


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FINS_FI_SIF - SAP S/4HANA Finance: Subsequent Implementation of Functions

  • Message number: 109

  • Message text: Company code &1 is not assigned to an active project

  • Show details Hide details
  • What causes this issue?

    Correction postings for balance carryforward are only possible if a
    project with either of the following project types exists for company
    code &V1&.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    <DS:SIMG.FINSVC_SIL_PROJ>Subsequent Implementation of a Further
    Accounting Principle</>
    <DS:SIMG.FINSV_SIS_PR>Subsequent Implementation of Document Splitting</>
    No correction postings for balance carryforward are possible for
    completed projects.

    System Response

    How to fix this error?

    Check the customizing settings for the appropriate project in the
    implementation guide.
    Assign company code &V1& to the appropriate project.
    If necessary, start the migration project.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_FI_SIF109 - Company code &1 is not assigned to an active project ?

    The SAP error message FINS_FI_SIF109 indicates that the company code specified in the transaction is not assigned to an active project. This error typically occurs in the context of project system (PS) or financial accounting (FI) when trying to perform actions related to a project that requires a valid company code assignment.

    Cause:

    1. Company Code Not Assigned: The company code you are trying to use is not linked to the project in question.
    2. Inactive Project: The project you are trying to access may not be active or may have been archived.
    3. Configuration Issues: There may be configuration issues in the project system or financial accounting settings that prevent the assignment of the company code to the project.

    Solution:

    1. Check Project Assignment:

      • Go to the project definition in the Project System (transaction code CJ20N or CJ02).
      • Verify if the company code is assigned to the project. If not, you may need to assign it.
    2. Activate the Project:

      • Ensure that the project is active. If the project is not active, you may need to activate it using the appropriate transaction.
    3. Review Company Code Settings:

      • Check the configuration settings for the company code in the project system. Ensure that the company code is properly set up and linked to the project.
    4. Consult with SAP Basis or Configuration Team:

      • If you are unable to resolve the issue, consult with your SAP Basis or configuration team to ensure that all necessary settings are correctly configured.
    5. Check Authorization:

      • Ensure that you have the necessary authorizations to access the project and perform the required actions.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and CJ01 (Create Project).
    • Documentation: Refer to SAP documentation or help files for detailed information on project management and company code assignments.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.

    By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker