Do you have any question about this error?
Message type: E = Error
Message class: FINS_FI_SIF - SAP S/4HANA Finance: Subsequent Implementation of Functions
Message number: 036
Message text: Company code &1 of ledger &2 must be assigned to project &3
There are cross-company code postings in your system that must, be
posted to the target ledger of project &V3&.
All company codes that are connected by cross-company code postings,
which are specific to a ledger group, must be assigned to this project.
You can configure this message for postings to the previous fiscal years
according to your requirements.
To change the message, choose
<DS:SIMG.SIMG_CFORFBOBA5BELE>Change Message Control for Document
Processing</> in Customizing for global settings in Financial
Accounting.
You can find the application area and message number in the technical
information.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FINS_FI_SIF036
- Company code &1 of ledger &2 must be assigned to project &3 ?The SAP error message FINS_FI_SIF036 indicates that there is a missing assignment between a company code, a ledger, and a project. Specifically, it states that the company code (represented by &1) of the ledger (represented by &2) must be assigned to the project (represented by &3). This error typically occurs in the context of financial accounting and project management within SAP.
Cause:
The error is caused by the following scenarios:
- Missing Assignment: The company code and ledger are not properly assigned to the specified project in the system.
- Configuration Issues: There may be a configuration issue in the project system or financial accounting settings that prevents the assignment from being recognized.
- Data Entry Errors: There may be a mistake in the data entry where the project, company code, or ledger is incorrectly specified.
Solution:
To resolve this error, you can follow these steps:
Check Project Assignment:
- Go to the project definition in the Project System (transaction code CJ20N or CJ02).
- Verify that the company code and ledger are correctly assigned to the project.
Assign Company Code and Ledger:
- If the assignment is missing, you can assign the company code and ledger to the project:
- Navigate to the project definition.
- In the project details, look for the "Assign Company Code" or "Assign Ledger" options.
- Make the necessary assignments and save your changes.
Review Configuration:
- Check the configuration settings in the Project System and Financial Accounting modules to ensure that the company code and ledger are set up correctly.
- Use transaction codes like SPRO to access the configuration settings and verify the relevant settings.
Consult Documentation:
- Review SAP documentation or help resources for specific guidance on project assignments and ledger configurations.
Contact Support:
- If the issue persists after checking the assignments and configurations, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to resolve the FINS_FI_SIF036 error and ensure that the company code, ledger, and project are correctly linked in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
FINS_FI_SIF035
No fiscal year variant found for ledger &1/company code &2
What causes this issue? If a company code is used in Asset Accounting, the system checks for the existence of fiscal year variants for this company c...
FINS_FI_SIF034
No valid project Customizing found for project &1
What causes this issue? The system could not find any valid Customizing for project &V1& that can be used for data transfer.System Response ...
FINS_FI_SIF037
Implementation of ledger &1 for comp.code &2 in year &3 is not supported
What causes this issue? You are trying to implement the new ledger &V1& in Company Code &V2& effective as of fiscal year &V3&...
FINS_FI_SIF038
Customizing changes detected at target ledger &1, setting: "&2"
What causes this issue? The current customizing settings of the target ledgers assigned to the project have been compared with the settings of the cu...
Click on this link to search all SAP messages.