How To Fix FINS_FI_MPROJ019 - Preparations for project &1 have been completed by user &2


FINS_FI_MPROJ019 - Overview

  • Message type: E = Error

  • Message class: FINS_FI_MPROJ - Mass Data Project

  • Message number: 019

  • Message text: Preparations for project &1 have been completed by user &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FINS_FI_MPROJ019 - Details

  • The SAP error message FINS_FI_MPROJ019 indicates that preparations for a project (identified by &1) have already been completed by another user (identified by &2). This typically occurs in the context of project management or financial project processing within SAP, where certain preparatory steps must be completed before further actions can be taken.
    
    Cause: Concurrent User Activity: The error usually arises when multiple users are trying to perform actions on the same project simultaneously. If one user has already completed the necessary preparations, another user attempting to do the same will encounter this error. Locking Mechanism: SAP uses a locking mechanism to prevent data inconsistencies. When a user completes preparations for a project, the system locks that project for further modifications by other users until the process is finalized or released.
    Solution: Check User Activity: Verify if the user mentioned in the error message (&2) is currently working on the project. If so, you may need

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FINS_FI_MPROJ019 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker