How To Fix FINS_CFIN_PS046 - WBS Element ID &2 was removed from Project &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FINS_CFIN_PS - Messages for Project replication in Central Finance

  • Message number: 046

  • Message text: WBS Element ID &2 was removed from Project &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_CFIN_PS046 - WBS Element ID &2 was removed from Project &1 ?

    The SAP error message FINS_CFIN_PS046 indicates that a Work Breakdown Structure (WBS) element has been removed from a project. This message typically arises in the context of project system (PS) functionalities within SAP, particularly when dealing with project management and financial integration.

    Cause:

    The error message can occur due to several reasons, including:

    1. Manual Deletion: The WBS element was manually deleted from the project structure.
    2. Project Structure Changes: Changes in the project structure or hierarchy that lead to the removal of the WBS element.
    3. Data Consistency Issues: Inconsistencies in the project data, possibly due to incorrect updates or data migration issues.
    4. Integration Issues: Problems with integration between different modules (e.g., Project System and Controlling) that may lead to discrepancies in the project data.

    Solution:

    To resolve the error, consider the following steps:

    1. Check Project Structure: Verify the current project structure to confirm whether the WBS element is indeed missing. You can do this by navigating to the project in the Project System (transaction code: CJ20N).

    2. Review Change Logs: Check the change logs for the project to see if there were any recent changes made to the WBS elements. This can help identify if the element was deleted intentionally or accidentally.

    3. Recreate WBS Element: If the WBS element was deleted and is still needed, you may need to recreate it. Ensure that all necessary attributes and relationships are correctly set up.

    4. Data Consistency Check: Run consistency checks for the project to identify any other potential issues. You can use transaction codes like CJEN (for project structure) or CJI3 (for project actuals) to analyze the data.

    5. Consult Documentation: Review SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.

    6. Contact SAP Support: If the issue persists and you cannot determine the cause, consider reaching out to SAP support for assistance. They may provide insights based on the specific configuration and version of your SAP system.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and CJ03 (Display Project) for managing WBS elements.
    • SAP Notes: Search for SAP Notes related to FINS_CFIN_PS046 for any known issues or fixes.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, providing additional insights or solutions.

    By following these steps, you should be able to diagnose and resolve the issue related to the FINS_CFIN_PS046 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant