How To Fix FINS_CFIN_PS002 - Project &1 is not updated.


FINS_CFIN_PS002 - Overview

  • Message type: E = Error

  • Message class: FINS_CFIN_PS - Messages for Project replication in Central Finance

  • Message number: 002

  • Message text: Project &1 is not updated.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_CFIN_PS002 - Project &1 is not updated. ?
    The SAP error message FINS_CFIN_PS002 indicates that a project (identified by &1) is not updated in the system. This error typically occurs in the context of SAP Central Finance (CFIN) when there are issues with the integration or synchronization of project data between the source system and the Central Finance system.
    Causes:
    
    Missing Project Data: The project may not exist in the Central Finance system or may not have been replicated correctly from the source system.
    Inconsistent Data: There may be inconsistencies in the project data between the source and Central Finance systems, such as missing or incorrect attributes.
    Authorization Issues: The user may not have the necessary authorizations to access or update the project data.
    Technical Issues: There could be technical issues related to the data transfer process, such as errors in the middleware or data mapping.
    
    Solutions:
    
    Check Project Existence: Verify that the project exists in the Central Finance system. If it does not, ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant