How To Fix FINS_CFIN_BC_REPORT059 -


FINS_CFIN_BC_REPORT059 - Overview

  • Message type: E = Error

  • Message class: FINS_CFIN_BC_REPORT - Business Configuration Validations of Report

  • Message number: 059

  • Message text:

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FINS_CFIN_BC_REPORT059 - Details

  • The SAP error message FINS_CFIN_BC_REPORT059 typically relates to issues in the Central Finance (CFIN) module, particularly when dealing with the reconciliation of financial data between the source systems and the Central Finance system. This error can occur during the execution of reports or during the data transfer process.
    
    Cause: The error can be caused by several factors, including but not limited to: Data Inconsistencies: There may be inconsistencies in the financial data being transferred from the source systems to the Central Finance system.
    Configuration Issues: Incorrect configuration settings in the Central Finance setup can lead to errors during data processing. Missing Master Data: Required master data (like cost centers, profit centers, etc.) may be missing in the Central Finance system. Technical Issues: There could be technical issues such as network problems, system performance issues, or bugs in the software.
    Solution: To resolve the FINS_CFIN_BC_REPORT059 error, you can take the following steps: Check Data Consistency: Review the data being transferred for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FINS_CFIN_BC_REPORT059 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant