How To Fix FINS_ACDOC_PLANNING073 - Profit center &1 doesn't belong to segment &3.


FINS_ACDOC_PLANNING073 - Overview

  • Message type: E = Error

  • Message class: FINS_ACDOC_PLANNING - Messages for Package FINS_ACDOC_PLANNING

  • Message number: 073

  • Message text: Profit center &1 doesn't belong to segment &3.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_ACDOC_PLANNING073 - Profit center &1 doesn't belong to segment &3. ?
    The SAP error message FINS_ACDOC_PLANNING073 indicates that there is a mismatch between the profit center and the segment in the planning document. Specifically, it means that the profit center specified in the document does not belong to the segment that is being referenced.
    
    Cause:
    Configuration Issues: The profit center may not be correctly assigned to the segment in the configuration settings of the SAP system. Data Entry Errors: There may be a mistake in the data entry where the wrong profit center or segment is being used. Master Data Issues: The master data for either the profit center or the segment may not be properly maintained, leading to inconsistencies. Planning Version: The planning version being used may not have the correct assignments or may not be activated.
    Solution: Check Profit Center Assignment: Go to the transaction code KE52 (Change Profit Center) and verify that the profit center is assigned to the correct segment. Ensure that the profit center is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author