How To Fix FINS_ACDOC_PLANNING069 - Account assignment &1 &2 doesn't belong to profit center &4.á


FINS_ACDOC_PLANNING069 - Overview

  • Message type: E = Error

  • Message class: FINS_ACDOC_PLANNING - Messages for Package FINS_ACDOC_PLANNING

  • Message number: 069

  • Message text: Account assignment &1 &2 doesn't belong to profit center &4.á

  • Show details Hide details
  • What causes this issue?

    It looks like you entered account assignment &V1&/&V2& and profit center
    &V4& in one plan data record. However, this account assignment is not
    valid for that profit center.
    &SYSTEM_RESPONSE&.
    The plan data is not saved.

    How to fix this error?

    To make the plan data record valid, you have the following options:
    Instead of profit center &V4&, enter profit center &V3& that is the
    profit center of the account assignment &V1&/&V2&.
    Instead of account assignment &V1&/&V2&, enter an account assignment
    that is valid for profit center &V4&.
    Assign the account assignment &V1&/&V2& to profit center &V4&.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_ACDOC_PLANNING069 - Account assignment &1 &2 doesn't belong to profit center &4.á ?
    The SAP error message FINS_ACDOC_PLANNING069 indicates that there is a mismatch between the account assignment and the profit center in a planning document. Specifically, it means that the account assignment (which could be a cost center, internal order, etc.) does not belong to the specified profit center.
    
    Cause: Incorrect Account Assignment: The account assignment (e.g., cost center, internal order) is not linked to the profit center specified in the document. Master Data Issues: The master data for the account assignment or profit center may not be set up correctly. For example, the profit center may not be assigned to the relevant cost center or internal order.
    Configuration Issues: There may be configuration issues in the system that prevent the correct mapping of account assignments to profit centers. Data Entry Errors: Manual data entry errors when creating or modifying the planning document can lead to this mismatch.
    Solution: Check Master Data: Verify that the account assignment (cost center, internal

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author