How To Fix FE105 - All scheduling deadlines are in the past (see long text)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FE - CO-PA module pool messages

  • Message number: 105

  • Message text: All scheduling deadlines are in the past (see long text)

  • Show details Hide details
  • What causes this issue?

    All the required scheduling deadlines are in the past. This data cannot
    cannot be accepted by the program.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Select deadlines in the future.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FE105 - All scheduling deadlines are in the past (see long text) ?

    The SAP error message FE105, which states "All scheduling deadlines are in the past (see long text)," typically occurs in the context of scheduling or planning activities within SAP, particularly in modules like Production Planning (PP) or Project System (PS). This error indicates that the system has identified that all the deadlines for the scheduling of a particular task or activity have already passed, making it impossible to schedule or plan further actions.

    Cause:

    1. Past Dates: The scheduling deadlines for the task or activity are set to dates that have already passed.
    2. Incorrect Data Entry: There may be incorrect or outdated data in the scheduling parameters or task definitions.
    3. System Configuration: The configuration settings for scheduling may not align with the current project or production timelines.
    4. Dependencies: There may be dependencies or constraints that have not been met, leading to the scheduling being pushed into the past.

    Solution:

    1. Check Dates: Review the scheduling deadlines for the task or activity in question. Ensure that the dates are set correctly and are in the future.
    2. Update Scheduling Parameters: If the deadlines are indeed in the past, update them to reflect the correct future dates.
    3. Review Dependencies: Check for any dependencies or constraints that may be affecting the scheduling. Ensure that all prerequisites are met.
    4. Consult Long Text: The error message often has a long text that provides additional context or specific details about the issue. Review this long text for more insights.
    5. Re-schedule: If necessary, attempt to re-schedule the task or activity after making the required adjustments.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the module you are working with.

    Related Information:

    • Transaction Codes: Depending on the module, you may be using transaction codes like CO01 (Create Production Order), CJ20N (Project Builder), or others where scheduling is relevant.
    • SAP Notes: Check SAP Notes for any known issues or patches related to scheduling errors.
    • User Roles: Ensure that you have the appropriate permissions to modify scheduling parameters.
    • Testing: After making changes, conduct tests to ensure that the scheduling works as expected without triggering the error again.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant module.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.