How To Fix FCOM_PLANNING_CORE071 - Cost element &1 cannot be used for cost element planning


FCOM_PLANNING_CORE071 - Overview

  • Message type: E = Error

  • Message class: FCOM_PLANNING_CORE - Messages for Package FCOM_PLANNING_CORE

  • Message number: 071

  • Message text: Cost element &1 cannot be used for cost element planning

  • Show details Hide details
  • What causes this issue?

    You have entered cost element &V1&. This cost element has the category
    &V2&, which is not valid for cost element planning.

    System Response

    You have entered invalid master data or referenced invalid master data
    that the system cannot process. Depending on where this occurred, the
    system prevents you from entering the data, prevents you from navigating
    further, or prevents further processing.

    How to fix this error?

    Enter a cost element that has a valid cost element category.
    Valid cost element categories for planning of primary costs are as
    follows:
    1
    4
    Valid cost element categories for planning of revenues are as follows:
    11
    12
    21 is a valid cost element category for planning of order costs.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FCOM_PLANNING_CORE071 - Cost element &1 cannot be used for cost element planning ?
    The SAP error message FCOM_PLANNING_CORE071 indicates that a specific cost element (denoted as &1) cannot be used for cost element planning. This error typically arises in the context of cost planning in SAP Controlling (CO) when trying to plan costs for a cost element that is not configured correctly for planning purposes.
    Causes:
    
    
    Cost Element Configuration: The cost element may not be set up for planning in the system. This can happen if the cost element is defined as a statistical cost element or if it is not marked for planning in the controlling area settings.
    
    
    Cost Element Type: The type of cost element (primary or secondary) may not be suitable for planning. For example, secondary cost elements are often used for internal allocations and may not be intended for direct planning.
    
    
    Planning Version: The planning version being used may not allow for planning on that specific cost element. If the version is locked

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant