Do you have any question about this error?
Message type: E = Error
Message class: FCOM_PLANNING_CORE - Messages for Package FCOM_PLANNING_CORE
Message number: 062
Message text: Operating concern could not be derived from the costing area &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FCOM_PLANNING_CORE062
- Operating concern could not be derived from the costing area &1 ?The SAP error message FCOM_PLANNING_CORE062 indicates that the system is unable to derive the operating concern from the specified costing area. This error typically occurs in the context of Profitability Analysis (CO-PA) when there is a mismatch or misconfiguration in the settings related to the costing area and operating concern.
Causes:
- Missing Configuration: The operating concern may not be properly assigned to the costing area in the configuration settings.
- Incorrect Costing Area: The costing area being used may not be linked to any operating concern.
- Data Inconsistency: There may be inconsistencies in the master data or configuration that prevent the system from deriving the operating concern.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the required data.
Solutions:
Check Configuration:
- Go to the configuration settings in SAP (Transaction code: SPRO).
- Navigate to Controlling -> Profitability Analysis -> Basic Settings -> Define Operating Concern.
- Ensure that the operating concern is correctly assigned to the costing area in question.
Verify Costing Area:
- Check the costing area settings (Transaction code: OKTZ).
- Ensure that the costing area is linked to the correct operating concern.
Review Master Data:
- Check the master data related to the costing area and operating concern.
- Ensure that all necessary data is maintained and consistent.
Check Authorizations:
- Ensure that the user has the necessary authorizations to access the relevant data and perform the required actions.
Consult Documentation:
- Review SAP documentation or notes related to this error message for any specific guidance or updates.
Debugging:
- If the issue persists, consider debugging the process to identify where the derivation is failing.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
Community Forums: Consider searching or posting in SAP community forums for insights from other users who may have encountered the same issue.
By following these steps, you should be able to identify and resolve the cause of the error message FCOM_PLANNING_CORE062.
Get instant SAP help. Start your 7-day free trial now.
FCOM_PLANNING_CORE061
Specify a controlling area in the select options
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCOM_PLANNING_CORE060
Access type &1 not supported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCOM_PLANNING_CORE063
Field &1 is already assigned to InfoObject &2. See Long Text
What causes this issue? The assignement between field &V1& and infoobject &V2& already exists and can be in use for all Operating Con...
FCOM_PLANNING_CORE064
Assignment for field &1 changed from InfoObject &2 to &3
What causes this issue? The assignement for field &V1& is changed from InfoObject &V2& to InfoObject &V3&.System Response Vi...
Click on this link to search all SAP messages.