Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: FCO_EBW - Message class for Event-Based WIP
Message number: 034
Message text: Assign source G/L account &1 for Event-Based WIP posting
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FCO_EBW034
- Assign source G/L account &1 for Event-Based WIP posting ?The SAP error message FCO_EBW034 indicates that there is an issue with the assignment of a source General Ledger (G/L) account for Event-Based Work in Progress (WIP) posting. This error typically arises in the context of project accounting or production orders where WIP needs to be calculated and posted based on the costs incurred.
Cause:
The error occurs when the system cannot find a valid source G/L account for the specified event-based WIP posting. This can happen due to several reasons:
- Missing Configuration: The G/L account for WIP may not be configured in the system for the relevant controlling area or company code.
- Incorrect Account Assignment: The account assignment for the WIP may not be correctly set up in the relevant master data (e.g., cost centers, internal orders, or projects).
- Missing Event-Based WIP Settings: The settings for event-based WIP may not be properly defined in the system, leading to the inability to post WIP correctly.
Solution:
To resolve the error, you can follow these steps:
Check Configuration:
- Go to the configuration settings in SAP (Transaction code SPRO).
- Navigate to Controlling -> Product Cost Controlling -> Cost Object Controlling -> Event-Based WIP.
- Ensure that the source G/L accounts are correctly assigned for the relevant controlling area and company code.
Review Master Data:
- Check the master data for the cost objects (e.g., production orders, internal orders, or projects) to ensure that the correct G/L accounts are assigned.
- Verify that the cost elements are correctly defined and linked to the appropriate G/L accounts.
Define Event-Based WIP Settings:
- Ensure that the event-based WIP settings are properly defined in the system.
- Check if the necessary parameters for WIP calculation are set up correctly.
Consult Documentation:
- Review SAP documentation or help files related to Event-Based WIP to ensure that all necessary configurations are in place.
Testing:
- After making the necessary changes, perform a test posting to see if the error persists.
Related Information:
OKC4
(for defining WIP accounts) or KKS1
(for WIP calculation) to access the relevant settings.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in Controlling (CO) or Financial Accounting (FI) for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
FCO_EBW033
WIP document simulated successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCO_EBW032
WIP B/S Account &1, P/L Account &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCO_EBW035
Order/Object ID &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCO_EBW036
Analyze Event-Based WIP and Variance Exceptions Job is finished.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.