Message type: E = Error
Message class: FCCX_MSG_S4 - Messages originally created in EHP
Message number: 038
Message text: RFC scheduling Error: Resource Failure
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FCCX_MSG_S4038
- RFC scheduling Error: Resource Failure ?The SAP error message FCCX_MSG_S4038, which indicates an "RFC scheduling Error: Resource Failure," typically arises in the context of SAP's Central Finance or other scenarios involving Remote Function Calls (RFC). This error suggests that there is a failure in scheduling the RFC due to resource constraints or issues. Causes: Resource Limitations: The system may be running low on resources such as memory, CPU, or network bandwidth, which can prevent the successful scheduling of RFC calls.
Configuration Issues: Incorrect configuration of the RFC destination or the related settings in the SAP system can lead to this error. System Load: High system load or contention for resources can cause delays or failures in processing RFC calls. Network Issues: Problems with the network connection between the systems involved in the RFC call can lead to failures. Background Job Failures: If the RFC is triggered by a background job, any issues with that job can also lead to this error. Solutions: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
FCCX_MSG_S4037
RFC scheduling Error: Communication Failure. Text: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCCX_MSG_S4036
RFC scheduling Error: System Failure. Text: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCCX_MSG_S4039
RFC scheduling Error: Scheduling was not possible within &1 seconds
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FCCX_MSG_S4040
RFC scheduling Error: An unknown Exception occured
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.