How To Fix FCC1452 - Planned duration day must be between 0 and 365 days


FCC1452 - Overview

  • Message type: E = Error

  • Message class: FCC1 - Messages in Financial Closing Cockpit

  • Message number: 452

  • Message text: Planned duration day must be between 0 and 365 days

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FCC1452 - Planned duration day must be between 0 and 365 days ?
    The SAP error message FCC1452, which states "Planned duration day must be between 0 and 365 days," typically occurs in the context of project management or planning within SAP systems, particularly when dealing with project definitions, work breakdown structures (WBS), or similar planning elements.
    
    Cause: This error arises when a user attempts to enter a planned duration for a project or task that exceeds the acceptable range of 0 to 365 days. The planned duration is a critical parameter that defines how long a project or task is expected to take, and it must fall within the specified limits to ensure proper scheduling and resource allocation.
    Solution: To resolve this error, you should: Check the Input Value: Review the value you are trying to enter for the planned duration. Ensure that it is a positive integer and does not exceed 365 days. Adjust the Duration: If the planned duration exceeds 365 days, consider breaking the project

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author