Message type: E = Error
Message class: FARR_RAI - Revenue Accounting Item
Message number: 779
Message text: Comp.code &1/acct.pr. &2/pack. &3: Period not closed in source acct.pr.
Company code &v1&/accounting principle &v2&/package &v3&: The last
period up to the specified transfer date must be closed in the defined
source accounting principle.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FARR_RAI779
- Comp.code &1/acct.pr. &2/pack. &3: Period not closed in source acct.pr. ?The SAP error message FARR_RAI779 indicates that there is an issue with the period not being closed in the source account period for a specific company code, account period, and package. This error typically arises in the context of Asset Accounting (FI-AA) when trying to perform transactions that require the accounting period to be closed.
Cause: The error occurs when: You are trying to post a transaction (like an asset transfer, depreciation posting, etc.) in a period that has not been closed in the source account period. The system is configured to prevent postings in open periods to ensure data integrity and compliance with accounting standards.
Solution: To resolve this error, you can take the following steps: Check the Period Status: Go to the transaction code OB52 (or use the menu path: Financial Accounting > General Ledger > Periodic Processing > Open and Close Posting Periods). Verify if the period for the specified company code and account type is
Get instant SAP help. Sign up for our Free Essentials Plan.
FARR_RAI778
Comp.code &1/acct.pr. &2: Period not closed in source acct.pr.
What causes this issue? Company code &v1&/accounting principle &v2&: The last period up to the specified transfer date must be closed...
FARR_RAI777
Comp.code &1/acct.pr. &2/pack. &3: Invalid transfer date specified
What causes this issue? Invalid transfer date was specified for company code &v1&, accounting principle &v2& and package &v3&...
FARR_RAI780
Comp.code &1/acct.pr. &2: Period before date of adoption is open
What causes this issue? Company code &v1&/accounting principle &v2&: Change of status from <LS>Adoption preparation</> to...
FARR_RAI781
Comp.code &1/acct.pr. &2/pack. &3: Period before date of adoption is open
What causes this issue? Company code &v1&/accounting principle &v2&/package &v3&: Change of status from <LS>Adoption pr...
Click on this link to search all SAP messages.