How To Fix FARR_RAI768 - Item &1: Company code &3 for accounting principle &4 not productive


FARR_RAI768 - Overview

  • Message type: E = Error

  • Message class: FARR_RAI - Revenue Accounting Item

  • Message number: 768

  • Message text: Item &1: Company code &3 for accounting principle &4 not productive

  • Show details Hide details
  • What causes this issue?

    You want to process revenue accounting item &v1& for accounting
    principle &v4& in company code &v3&.
    <ZH>Migration without transition phase:</>
    Revenue accounting items that were created after the transfer date,
    which was defined in customizing, can only be processed once the
    accounting principle in a company code has status <LS>Productive</>.
    <ZH>Migration with transition phase:</>
    Revenue accounting items that were created after the transfer date but
    before the date of adoption (defined in customizing) can be processed
    once the accounting principle in a company code has status <LS>Adoption
    Preparation</>.
    Revenue accounting items that were created after the date of adoption,
    which was defined in customizing, can only be processed once the
    accounting principle in a company code has status <LS>Productive</>.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Procedure for System Administrators

    <ZH>Migration without transition phase:</>
    Once all initial load activities for company code &v3& and accounting
    principle &v4& have been finalized, change the status of the accounting
    principle &v4& in company code &v3& to <LS>Productive</> in customizing.
    <ZH>Migration with transition phase:</>
    Once all migration activities (initial load or reprocessing of existing
    revenue accounting items for accounting principle &v4&) for company code
    &v3& and accounting principle &v4& have been finalized, run the report
    for cumulative catch up and change the status to <LS>Adoption
    Preparation.</>
    To maintain the customizing settings, choose the @KQ@ (<LS>Customizing
    </>) pushbutton.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FARR_RAI768 - Item &1: Company code &3 for accounting principle &4 not productive ?
    The SAP error message FARR_RAI768 indicates that there is an issue with the configuration of the asset accounting for a specific item in the system. This error typically arises when the system is unable to process an asset due to the company code or accounting principle not being set up correctly for productive use.
    
    Cause: Company Code Configuration: The company code specified in the error message may not be configured correctly for the accounting principle in question. This could mean that the company code is not active or not set up for the relevant asset accounting. Accounting Principle: The accounting principle specified may not be assigned to the company code or may not be configured to allow productive use of the asset. Asset Master Data: The asset master data for the item may not be correctly set up, leading to inconsistencies in how the asset is processed.
    Solution: Check Company Code Settings: Go to the configuration settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant