Do you have any question about this error?
Message type: E = Error
Message class: FARR_RAI - Revenue Accounting Item
Message number: 097
Message text: Item &1: Mismatch of internal- and external WBS element number
The item &v1& has been sent with a value &v2& in field PSPNR which does
not match the value determined by the externally used WBS element number
PS_POSID for this field &v3&.
The item cannot be transferred.
The internal WBS element is part of the fix COPA characteristics
(COPACRIT) and may also be filled. However, the external WBS element is
used to determine the internal one and the result is checked against a
given internal number in the revenue accounting item to avoid
inconsistent settings.
Check which field is incorrect and change either field PS_POSID or
PSPNR.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FARR_RAI097
- Item &1: Mismatch of internal- and external WBS element number ?The SAP error message FARR_RAI097 indicates a mismatch between the internal and external Work Breakdown Structure (WBS) element numbers in the context of Asset Accounting (FI-AA) or related modules. This error typically arises when there is an inconsistency in the WBS element data being processed, which can occur during various transactions, such as asset acquisition or transfer.
Cause:
- Data Entry Error: The WBS element number entered may not match the expected format or may not exist in the system.
- Configuration Issues: There may be discrepancies in the configuration settings for WBS elements in the system.
- Master Data Issues: The WBS element may not be properly defined or activated in the system.
- Integration Issues: If the WBS element is being used across different modules (e.g., Project System and Asset Accounting), there may be inconsistencies in how the data is maintained.
Solution:
- Verify WBS Element: Check the WBS element number entered in the transaction. Ensure that it is correct and exists in the system.
- Check Configuration: Review the configuration settings for WBS elements in the system. Ensure that the settings align with the requirements of your organization.
- Review Master Data: Ensure that the WBS element is properly defined and activated. You can do this by navigating to the WBS element in the Project System (if applicable) and checking its status.
- Consistency Check: Run consistency checks in the system to identify any discrepancies between internal and external WBS elements.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling WBS elements and related transactions.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CJ20N
(Project Builder) or CJI3
(Project Actual Line Items) to review WBS elements and their associated data.By following these steps, you should be able to identify and resolve the cause of the FARR_RAI097 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
FARR_RAI096
Structure &2 does not contain field &1
What causes this issue? The check of the work structures showed that the required field (component category &v3&) is not contained in the cus...
FARR_RAI095
Revenue accounting item class &1 must be generated or regenerated
What causes this issue? You can not work with Revenue Accounting Items of class &v1& before its interfaces have been generated successfully f...
FARR_RAI098
Revenue accounting item class &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_RAI099
Error when reading table &1 (class &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...