Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FARR_PROCESS_CHECK076 - Compound group POB &1 must have fulfillment type PoC or time-based


FARR_PROCESS_CHECK076 - Overview

  • Message type: E = Error

  • Message class: FARR_PROCESS_CHECK - Messages for Input Checks in Process Layer

  • Message number: 076

  • Message text: Compound group POB &1 must have fulfillment type PoC or time-based

  • Show details Hide details
  • What causes this issue?

    The compound group performance obligation has an unsupported fulfillment
    type.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Adjust the settings for the derivation of the attributes of the compound
    group performance obligation: the attribute FULFILL_TYPE must have the
    'T' (Time-Based) or 'O' (Percentage of Completion) value.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


FARR_PROCESS_CHECK076 - Details

  • The SAP error message FARR_PROCESS_CHECK076 indicates that there is an issue with the configuration of a compound group in the context of the SAP Flexible Real Estate Management (RE-FX) module, specifically related to the fulfillment type of a compound group.
    
    Cause: This error typically occurs when you are trying to process a compound group (in this case, identified as POB &1) that does not have the required fulfillment type. The fulfillment type must be either PoC (Percentage of Completion) or time-based. If the compound group is configured with a different fulfillment type, the system will throw this error.
    Solution: To resolve this error, you can follow these steps: Check Compound Group Configuration: Go to the configuration settings for the compound group in question. Verify the fulfillment type assigned to the compound group. It should be set to either PoC or time-based. Change Fulfillment Type: If the fulfillment type is incorrect, you will need to change it to either PoC

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FARR_PROCESS_CHECK076 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant