Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: FARR_PROCESS_CHECK - Messages for Input Checks in Process Layer
Message number: 017
Message text: POB &1 is relevant for results analysis. This is not supported
INCLUDE FARR_BLOCKED_SCENARIO OBJECT DOKU ID TX
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FARR_PROCESS_CHECK017
- POB &1 is relevant for results analysis. This is not supported ?The SAP error message FARR_PROCESS_CHECK017 indicates that a particular Purchase Order (POB) is relevant for results analysis, but the system does not support processing it in the current context. This error typically arises in the context of project systems or controlling modules where results analysis is performed.
Cause:
- Results Analysis Configuration: The Purchase Order may not be properly configured for results analysis. This could be due to missing settings in the controlling area or project definition.
- Document Type: The document type of the Purchase Order may not be set up to allow results analysis.
- Status of the Purchase Order: The status of the Purchase Order may not allow for results analysis processing. For example, if the order is closed or has been flagged in a way that prevents further processing.
- Missing Master Data: Required master data (like cost elements, activity types, etc.) may be missing or incorrectly configured.
Solution:
- Check Configuration: Review the configuration settings for results analysis in the controlling area and ensure that the Purchase Order type is set up correctly for results analysis.
- Review Purchase Order: Check the status and settings of the Purchase Order. Ensure that it is open and not flagged for any restrictions.
- Document Type Settings: Verify that the document type associated with the Purchase Order is allowed for results analysis. You may need to adjust the settings in the configuration.
- Master Data Verification: Ensure that all necessary master data is in place and correctly configured. This includes checking cost elements, activity types, and any other relevant data.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration steps related to results analysis and Purchase Orders.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
FARR_PROCESS_CHECK016
POB &1 has the event date as a start date but no duration
What causes this issue? Performance obligation &v1& should either have the event date as a start date, or have a duration, but not both.Syste...
FARR_PROCESS_CHECK015
POB &1 is value-relevant with certain attributes. This is not supported
What causes this issue? In Contract Management, only value-relevant performance obligations with one of the following attributes are supported: The f...
FARR_PROCESS_CHECK018
Performance obligation &1 has POC fulfillment type. This is not supported
What causes this issue? <ls>Contract Management</> doesn't support performance obligations with fulfillment type <ls>Percentag...
FARR_PROCESS_CHECK019
Man. fulfillment of POB &1: The provided fulfillment type &2 is invalid
What causes this issue? The manual fulfillment process supports only the following fulfillment types: <ZK>event-based </>(E) or <ZK>...
Click on this link to search all SAP messages.