Message type: E = Error
Message class: FARR_INFLIGHT_CHECK -
Message number: 044
Message text: C17: Incorrect cumulated quantity on deferral item for POB &1 contr. &2
The sum of the revenue amount delta column on the deferral items in
previous periods for this performance obligation is not consistent with
the posted revenue amount in the current period.
This can lead to inconsistent records in table FARR_D_DEFITEM.
To determine the correct handling of the revenue amount posted and the
revenue amount planned this check sums up the column REV_AMT_DELTA for
all previous periods . The result is then compared to the value of the
posted revenue and the splitout amount in the current period.
This check is performed to the current period and all future periods in
which deferral items exists.
The example bellow illustrates the logic of this check. (It is assumed,
that the current fiscal year is 2018 and the open period is 004.
Furthermore a prospective splitout was performed in period 2018003.)
RECON_KEY,,POB_ID,,CONDITION_TYPE,,REV_AMT_DELTA,,REV_AMT_POSTED,,
PRO_AMT_CUMULATE
2018001001,,POB1,,PR00,,100,,0,,0
2018002001,,POB1,,PR00,,100,,100,,0
2018003001,,POB1,,PR00,,120,,0,,200
2018004001,,POB1,,PR00,,120,,120,,200
2018005001,,POB1,,PR00,,120,,<ZK>200</>,,200
The sum of the revenue in previous periods is 320. In the current period
the revenue posted is 120 and the prospective splitout amount is 200. No
inflight check C17 error is raised.
During the check in period 2018/005 an inflight check C17 error is
raised. This is due to the incorrect revenue posted value in column
REV_AMT_POSTED. The sum of the revenue amount for posting in previeous
periods is 440. The revenue posted and the prospective splitout amount
add up to 420.
Buffers checked
Performance obligation data buffer:,,MTS_POB_DATA_BUFFER
Deferral items data buffer:,,MTS_DEFITEM_NSTAT_PRICE
The RAI processing is stopped or the manual transaction from the UI is
stopped.
You can search for SAP notes related to inflight check C17 by using the
terms FARR_INFLIGHT_CHECK and C17.
You can also check if there is inconsistent data already in the system.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FARR_INFLIGHT_CHECK044
- C17: Incorrect cumulated quantity on deferral item for POB &1 contr. &2 ?The SAP error message FARR_INFLIGHT_CHECK044 C17 indicates that there is an issue with the cumulated quantity on a deferral item for a specific Profitability Object (POB) and contract. This error typically arises in the context of SAP's Revenue Accounting and Reporting (RAR) module, which is used for managing revenue recognition in compliance with accounting standards.
Cause: The error is usually caused by one of the following issues: Incorrect Configuration: The configuration settings for the deferral items or the related contracts may not be set up correctly, leading to discrepancies in the cumulated quantities. Data Inconsistencies: There may be inconsistencies in the data entered for the deferral items, such as incorrect quantities or amounts that do not match the expected values. Incomplete Processing: The processing of related documents (like sales orders, invoices, etc.) may not have been completed, leading to an incorrect state of the deferral item. Manual Adjustments: If manual adjustments were made to the deferral
Get instant SAP help. Sign up for our Free Essentials Plan.
FARR_INFLIGHT_CHECK043
C26: Multiple change type records for contr. mod. for POB &1 contr. &2
What causes this issue? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG.FARR_VC_...
FARR_INFLIGHT_CHECK042
C26: No change type records for contr. modification for POB &1 contr. &2
What causes this issue? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG.FARR_VC_...
FARR_INFLIGHT_CHECK045
C17: Incorrect cumulated amount on deferral items for POB &1 contract &2
What causes this issue? The sum of the revenue quantity delta column on the deferral items in previous periods for this performance obligation is not...
FARR_INFLIGHT_CHECK046
C26: No deferral item with prospective split for POB &1 in contract &2
What causes this issue? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG.FARR_VC_...
Click on this link to search all SAP messages.