Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FARR_CONTRACT_UI299 - Contract &1 cannot be processed as it is blocked


FARR_CONTRACT_UI299 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTRACT_UI - Revenue Accounting - Contract UI

  • Message number: 299

  • Message text: Contract &1 cannot be processed as it is blocked

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FARR_CONTRACT_UI299 - Details

  • The SAP error message FARR_CONTRACT_UI299 indicates that a specific contract (identified by the contract number &1) cannot be processed because it is currently blocked. This blocking can occur for various reasons, and understanding the cause is essential for resolving the issue.
    Possible Causes:
    
    Manual Blocking: The contract may have been manually blocked by a user due to various reasons, such as compliance checks or internal reviews.
    Status Issues: The contract might be in a status that does not allow processing, such as "Blocked," "Inactive," or "Pending Approval."
    Open Items: There may be open items or pending transactions associated with the contract that need to be resolved before processing can continue.
    Authorization Issues: The user attempting to process the contract may not have the necessary authorizations to access or modify the contract.
    System Configuration: Certain configurations in the SAP system may lead to contracts being automatically blocked based on specific criteria.
    
    Solutions:
    
    Check Contract Status: Review the status of

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FARR_CONTRACT_UI299 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker