How To Fix FARR_CONTRACT_MAIN890 - Contract &1 skipped because no. of POBs is higher than block size.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 890

  • Message text: Contract &1 skipped because no. of POBs is higher than block size.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FARR_CONTRACT_MAIN890 - Contract &1 skipped because no. of POBs is higher than block size. ?
    The SAP error message FARR_CONTRACT_MAIN890 indicates that a contract has been skipped because the number of Purchase Order Blocks (POBs) associated with that contract exceeds the allowed block size. This typically occurs in the context of contract management within the SAP system, particularly in the area of financial accounting and contract management.
    
    Cause: Exceeding Block Size: The primary cause of this error is that the number of POBs linked to a specific contract exceeds the predefined block size limit set in the system. Each contract can have a maximum number of POBs that can be processed at one time, and if this limit is exceeded, the contract will be skipped during processing. Configuration Settings: The block size limit may be configured in the system settings, and it may not be appropriate for the volume of data being processed. Data Integrity Issues: There may be issues with the data integrity or the way POBs are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant