Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FARR_CONTRACT_MAIN178 - Changing quantity unit to percentage (%) for perf. oblig. &1 impossible


FARR_CONTRACT_MAIN178 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 178

  • Message text: Changing quantity unit to percentage (%) for perf. oblig. &1 impossible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FARR_CONTRACT_MAIN178 - Details

  • The SAP error message FARR_CONTRACT_MAIN178 indicates that there is an issue with changing the quantity unit to a percentage (%) for a performance obligation in a contract. This typically occurs in the context of contract management, particularly when dealing with performance obligations in SAP's Flexible Real Estate Management (RE-FX) or similar modules.
    
    Cause: The error arises when: Incompatible Unit of Measure: The system does not allow changing the unit of measure to a percentage for the specified performance obligation. This could be due to the nature of the obligation or the configuration settings in the system. Contract Configuration: The contract may have been set up in a way that does not support percentage-based performance obligations. Data Integrity Issues: There may be existing data or settings that conflict with the change you are trying to make.
    Solution: To resolve this error, consider the following steps: Check Contract Settings: Review the configuration of the contract and the performance obligation. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FARR_CONTRACT_MAIN178 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker