How To Fix FARR_CONTR_LIFECYCLE102 - POB &1: Freeze date &2 must not be on the same day as unfreeze date &3.


FARR_CONTR_LIFECYCLE102 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTR_LIFECYCLE - Message from Contract Lifecyle (RAR 2.0 Object Model)

  • Message number: 102

  • Message text: POB &1: Freeze date &2 must not be on the same day as unfreeze date &3.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FARR_CONTR_LIFECYCLE102 - POB &1: Freeze date &2 must not be on the same day as unfreeze date &3. ?
    The SAP error message FARR_CONTR_LIFECYCLE102 indicates that there is a conflict between the freeze date and the unfreeze date for a particular object, such as a contract or asset. Specifically, the error states that the freeze date must not be on the same day as the unfreeze date. 
    
    Cause: This error typically arises in the context of asset accounting or contract management when: A freeze date is set to prevent changes to a contract or asset on a specific date. An unfreeze date is also set for the same day, which creates a logical inconsistency since the system cannot simultaneously freeze and unfreeze an object on the same date.
    Solution: To resolve this error, you need to adjust either the freeze date or the unfreeze date so that they do not fall on the same day. Here are the steps you can take: Review the Dates: Check the freeze and unfreeze dates for the relevant contract

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker