How To Fix FARR_CONTR_LIFECYCLE058 - Prospective change cannot perform on POB &1 with deferral method changed.


FARR_CONTR_LIFECYCLE058 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTR_LIFECYCLE - Message from Contract Lifecyle (RAR 2.0 Object Model)

  • Message number: 058

  • Message text: Prospective change cannot perform on POB &1 with deferral method changed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FARR_CONTR_LIFECYCLE058 - Prospective change cannot perform on POB &1 with deferral method changed. ?
    The SAP error message FARR_CONTR_LIFECYCLE058 indicates that a prospective change cannot be performed on a Profitability Object (POB) because the deferral method has been changed. This typically occurs in the context of SAP's Financial Accounting and Reporting (FARR) module, particularly when dealing with contracts and their lifecycle management.
    
    Cause: The error arises when there is an attempt to make a prospective change (such as modifying a contract or profitability object) while the deferral method associated with that object has been altered. The deferral method is crucial for determining how revenues and expenses are recognized over time, and changing it can affect the integrity of financial reporting.
    Solution: To resolve this error, consider the following steps: Review the Deferral Method: Check the current deferral method assigned to the Profitability Object (POB) in question. Ensure that it is set correctly according to your business requirements. Revert Changes: If the deferral method was changed recently, consider reverting it back

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker