Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 200
Message text: Exception defined for project start: Document &1 &2 &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FAGL_SWITCH_LEAD_LDG200
- Exception defined for project start: Document &1 &2 &3 ?The SAP error message FAGL_SWITCH_LEAD_LDG200 typically occurs in the context of the New General Ledger (New GL) functionality in SAP. This error is related to the project start and indicates that there is an exception defined for a specific document. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Document Issues: The error message indicates that there is a problem with a specific document (identified by the document number and other parameters) that is being processed in the context of a project start.
- Project Configuration: The project may not be properly configured in the system, leading to exceptions when trying to process financial documents.
- New GL Settings: There may be inconsistencies or issues with the New GL settings, particularly related to document splitting or leading ledger configurations.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to perform the action related to the document.
Solution:
- Check Document Details: Review the document details (document number, company code, fiscal year) to ensure that they are correct and that the document is valid for processing.
- Review Project Configuration: Ensure that the project is correctly configured in the system. Check the settings related to the New GL and make sure that all necessary parameters are set up correctly.
- Analyze New GL Settings: Look into the New GL settings, particularly the leading ledger and document splitting configurations. Ensure that they are aligned with the requirements of the project.
- Authorization Check: Verify that the user has the necessary authorizations to process the document. If not, work with your SAP security team to grant the required permissions.
- Consult SAP Notes: Check for any relevant SAP Notes that may address this specific error message. SAP frequently releases updates and patches that may resolve known issues.
- Debugging: If the issue persists, consider debugging the process to identify the exact point of failure. This may require assistance from an SAP technical consultant.
Related Information:
FB03
(Display Document), FBL1N
(Vendor Line Item Display), and FBL3N
(G/L Account Line Item Display) to analyze the documents in question.If the problem continues after trying the above solutions, it may be beneficial to escalate the issue to your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
FAGL_SWITCH_LEAD_LDG199
Ledger-specific documents excluded from checks:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FAGL_SWITCH_LEAD_LDG141
Ledger group &1 changed by switch project
What causes this issue? The ledger group &V1& contains the future leading ledger &V2&, but this ledger is <ZH>not</> the ...
FAGL_SWITCH_LEAD_LDG201
Switch project does not have the required status for this step
What causes this issue? The status of the switch project is "&V1&". You want to perform a step for which the status of the switch p...
FAGL_SWITCH_LEAD_LDG202
Activity was completed successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.