Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix FAGL_SWITCH_LEAD_LDG007 - Switch project is active and therefore cannot be deleted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)

  • Message number: 007

  • Message text: Switch project is active and therefore cannot be deleted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FAGL_SWITCH_LEAD_LDG007 - Switch project is active and therefore cannot be deleted ?

    The SAP error message FAGL_SWITCH_LEAD_LDG007 indicates that a switch project is currently active and cannot be deleted. This typically occurs in the context of the New General Ledger (New GL) functionality in SAP, where switch projects are used to manage the transition to the new ledger structure.

    Cause:

    1. Active Switch Project: The primary cause of this error is that there is an active switch project in the system. This means that the project is currently being used for configuration or has been implemented, and SAP does not allow deletion of active projects to maintain data integrity.
    2. Dependencies: There may be dependencies or configurations that rely on the active switch project, preventing its deletion.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Active Projects:

      • Go to the transaction code SCPR20 (Switch Project Management) to view the list of active switch projects.
      • Identify the switch project that is active and causing the error.
    2. Deactivate the Switch Project:

      • If you determine that the switch project is no longer needed, you can deactivate it. This typically involves:
        • Navigating to the switch project in SCPR20.
        • Selecting the project and choosing the option to deactivate it.
      • Note that deactivating a switch project may have implications for your system configuration, so ensure that you understand the consequences.
    3. Consult Documentation:

      • Review SAP documentation or notes related to the specific switch project you are working with. This can provide insights into the implications of deactivation and any necessary steps to take.
    4. Contact SAP Support:

      • If you are unsure about the implications of deactivating the switch project or if you encounter issues during the process, consider reaching out to SAP support for assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • SCPR20: Switch Project Management
      • SCPR20: To view and manage switch projects.
    • New General Ledger (New GL): Understanding the New GL functionality in SAP can help you grasp the context of switch projects and their importance in financial reporting and accounting.
    • SAP Notes: Check for any relevant SAP Notes that may provide additional guidance or updates related to switch projects and their management.

    By following these steps, you should be able to address the FAGL_SWITCH_LEAD_LDG007 error and manage your switch projects effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker