Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 000
Message text: Multiple active switch projects exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FAGL_SWITCH_LEAD_LDG000
- Multiple active switch projects exist ?The SAP error message FAGL_SWITCH_LEAD_LDG000 indicates that there are multiple active switch projects in the system, which can lead to conflicts or inconsistencies in the financial data. This error typically arises in the context of the New General Ledger (New GL) functionality in SAP, where switch projects are used to manage the transition from classic GL to New GL.
Cause:
Multiple Active Switch Projects: The primary cause of this error is that there are multiple switch projects that are currently active in the system. This can happen if:
- Different teams or users have created switch projects without proper coordination.
- A switch project was not properly deactivated after its intended use.
Configuration Issues: There may be configuration issues in the system that allow multiple switch projects to be active simultaneously.
Solution:
To resolve the FAGL_SWITCH_LEAD_LDG000 error, you can follow these steps:
Identify Active Switch Projects:
- Use transaction code
SIMG
orSPRO
to navigate to the New GL settings and check for active switch projects.- You can also use transaction
FAGL_SWITCH
to view the list of switch projects.Deactivate Unnecessary Switch Projects:
- If you find multiple active switch projects, determine which ones are no longer needed.
- Deactivate the unnecessary switch projects. This can typically be done in the same transaction where you identified them.
Consult Documentation:
- Review the SAP documentation or notes related to switch projects and New GL to ensure that you are following the correct procedures.
Check for Dependencies:
- Ensure that deactivating a switch project does not affect any ongoing processes or reporting requirements.
Testing:
- After making changes, perform testing to ensure that the system behaves as expected and that the error message no longer appears.
Consult SAP Support:
- If you are unable to resolve the issue, consider reaching out to SAP support for assistance. They may provide specific notes or patches that address the issue.
Related Information:
FAGL_SWITCH
, SIMG
, and SPRO
for managing switch projects and configurations.By following these steps, you should be able to resolve the FAGL_SWITCH_LEAD_LDG000 error and ensure that your SAP system operates smoothly with the New General Ledger functionality.
Get instant SAP help. Start your 7-day free trial now.
FAGL_SLL_CLOCO015
An active task list of type &2 already exists for template &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FAGL_SLL_CLOCO014
Assignment deleted; template is retained in Closing Cockpit
What causes this issue? You want to delete a template for switching the leading ledger. When doing so, however, you only remove the assignment as pro...
FAGL_SWITCH_LEAD_LDG001
You do not have authorization for activity &2 in plan &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FAGL_SWITCH_LEAD_LDG002
Ledger &2 is defined as leading ledger (&1 is invalid)
What causes this issue? You have specified a ledger that is not defined as the current leading ledger.System Response The system issues an error mes...
Click on this link to search all SAP messages.