How To Fix FAC_MD_PROFIT_CENTER009 - The new validity period &1 - &2 overlaps with existing validity period.


FAC_MD_PROFIT_CENTER009 - Overview

  • Message type: E = Error

  • Message class: FAC_MD_PROFIT_CENTER - Message Class for Profit Center Master Data Object

  • Message number: 009

  • Message text: The new validity period &1 - &2 overlaps with existing validity period.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FAC_MD_PROFIT_CENTER009 - Details

  • The SAP error message FAC_MD_PROFIT_CENTER009 indicates that there is a conflict in the validity periods for a profit center. Specifically, it means that the new validity period you are trying to set overlaps with an existing validity period for the same profit center.
    
    Cause: This error typically occurs when: You are trying to create or modify a profit center with a validity period that overlaps with an already defined period for that profit center. The system enforces rules to ensure that there are no overlapping validity periods for profit centers to maintain data integrity.
    Solution: To resolve this error, you can take the following steps: Check Existing Validity Periods: Go to the transaction code for managing profit centers (e.g., KE52 for changing profit centers). Look up the profit center in question and review its existing validity periods. Adjust the New Validity Period: Modify the new validity period you are trying to set so that it does not overlap with the existing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FAC_MD_PROFIT_CENTER009 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker