How To Fix F4772 - Last check is in the future


F4772 - Overview

  • Message type: E = Error

  • Message class: F4 - Line items/balances/configuration

  • Message number: 772

  • Message text: Last check is in the future

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message F4772 - Last check is in the future ?
    The SAP error message F4772, which states "Last check is in the future," typically occurs in the context of financial transactions, particularly when dealing with payment runs or checks. This error indicates that the system has detected a discrepancy between the scheduled date of a check and the current date, meaning that the check's last execution date is set in the future.
    
    Cause: Future Date in Check Configuration: The check date or the last execution date for a payment run is set to a future date, which is not valid for processing at the current time. Incorrect Payment Run Settings: The settings for the payment run may have been configured incorrectly, leading to future dates being assigned. Data Entry Error: Manual entry of dates in the payment documents or check configurations may have resulted in a future date being inadvertently set.
    Solution: Check Payment Run Dates: Review the payment run settings and ensure that the dates

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant