How To Fix F=149 - Please enter the profit center plan ledger in customizing


SAP Error Message - Details

  • Message type: E = Error

  • Message class: F= -

  • Message number: 149

  • Message text: Please enter the profit center plan ledger in customizing

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message F=149 - Please enter the profit center plan ledger in customizing ?

    The SAP error message "F=149 Please enter the profit center plan ledger in customizing" typically occurs in the context of financial planning and controlling (FICO) when there is a configuration issue related to profit center accounting. This error indicates that the system is unable to find the necessary configuration for the profit center plan ledger.

    Cause:

    1. Missing Configuration: The profit center plan ledger has not been defined in the system. This can happen if the necessary customizing settings have not been completed.
    2. Incorrect Settings: The settings for the profit center accounting may be incomplete or incorrect, leading to the system not recognizing the profit center plan ledger.
    3. Transport Issues: If the configuration was recently transported from another system (like a development environment), it may not have been properly imported or activated.

    Solution:

    To resolve this error, you need to ensure that the profit center plan ledger is correctly configured in the system. Here are the steps to do this:

    1. Access Customizing:

      • Go to the SAP Easy Access screen and enter the transaction code SPRO to access the SAP Reference IMG (Implementation Guide).
    2. Navigate to Profit Center Accounting:

      • Follow the path: Controlling -> Profit Center Accounting -> Planning -> Define Profit Center Plan Ledgers.
    3. Define Profit Center Plan Ledger:

      • Check if the profit center plan ledger is defined. If it is not, you will need to create a new entry.
      • Ensure that the ledger is assigned to the appropriate controlling area and that all necessary settings are completed.
    4. Check for Transport Issues:

      • If the configuration was recently transported, verify that the transport request was successful and that all necessary objects were included.
    5. Test the Configuration:

      • After making the necessary changes, test the configuration by attempting to execute the transaction that previously resulted in the error.
    6. Consult Documentation:

      • If you are unsure about the settings, refer to SAP documentation or consult with a colleague who has experience in SAP FICO configuration.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as KP06 (Plan Data for Cost Centers) and KPF6 (Plan Data for Profit Centers) to test planning functionalities.
    • SAP Notes: Check SAP Notes for any known issues or additional guidance related to this error message.
    • User Authorizations: Ensure that you have the necessary authorizations to make changes in the customizing settings.

    By following these steps, you should be able to resolve the error message F=149 and ensure that the profit center plan ledger is properly configured in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant