How To Fix F=112 - & & is sending secondary costs to itself


F=112 - Overview

  • Message type: E = Error

  • Message class: F= -

  • Message number: 112

  • Message text: & & is sending secondary costs to itself

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message F=112 - & & is sending secondary costs to itself ?
    The SAP error message F=112 typically indicates an issue related to the allocation of costs in the system, particularly when it comes to secondary cost elements. This error can occur in various scenarios, such as during the execution of cost allocations, assessments, or distributions in Controlling (CO) modules.
    Cause of Error F=112
    
    Incorrect Configuration: The error may arise due to incorrect configuration of cost centers, internal orders, or secondary cost elements.
    Circular Allocation: The error can occur if there is a circular allocation where a cost center or internal order is trying to allocate costs to itself.
    Missing Master Data: If the necessary master data (like cost centers or cost elements) is not properly maintained, it can lead to this error.
    Invalid Secondary Cost Element: The secondary cost element being used may not be valid for the allocation being attempted.
    
    Solution
    
    Check Configuration: Review the configuration of the cost centers, internal orders, and secondary cost elements to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author