Do you have any question about this error?
Message type: E = Error
Message class: F= -
Message number: 103
Message text: Flow of primary costs could not be determined
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
F=103
- Flow of primary costs could not be determined ?The SAP error message "F=103 Flow of primary costs could not be determined" typically occurs in the context of financial accounting and controlling when the system is unable to determine how primary costs should flow through the system. This can happen during various processes, such as during the posting of costs, settlement of internal orders, or during the execution of cost center accounting.
Causes:
- Missing or Incorrect Master Data: The relevant master data (such as cost centers, internal orders, or profit centers) may be missing or incorrectly configured.
- Incorrect Configuration: The configuration settings in the controlling area or the cost element may not be set up correctly.
- Posting Period Issues: The posting period may be closed, preventing the posting of costs.
- Cost Element Issues: The primary cost element may not be assigned correctly to the cost center or internal order.
- Missing Assignment: There may be missing assignments in the cost center or internal order master data.
- Transaction Type Issues: The transaction type used may not be valid for the type of posting being attempted.
Solutions:
- Check Master Data: Verify that all relevant master data (cost centers, internal orders, profit centers) is correctly set up and active.
- Review Configuration: Ensure that the configuration for the controlling area and cost elements is correct. This includes checking the assignment of cost elements to cost centers and internal orders.
- Open Posting Period: Check if the posting period is open for the transaction you are trying to execute. If it is closed, you may need to open it or post in a different period.
- Validate Cost Elements: Ensure that the primary cost element is correctly assigned to the relevant cost center or internal order.
- Check Assignments: Review the assignments in the master data to ensure that all necessary links are established.
- Review Transaction Types: Make sure that the transaction type being used is appropriate for the posting being attempted.
Related Information:
KS01
(Create Cost Center), KO01
(Create Internal Order), and KA01
(Create Primary Cost Element) to check and create master data.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Controlling (CO) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
F=102
Drill down successfully prepared
What causes this issue? The internal index entries for the <DS:CHAP.FERC_DRILL_DOWN>drill down</> utility have been successfully created....
F=101
Flow of primary costs successfully traced
What causes this issue? The flow of primary cost has been successfully traced for all objects in the current period.System Response The system issue...
F=104
Regulatory cost center & ignored
What causes this issue? The <DS:CHAP.FERC_STD_COST_ADJ>standard cost adjustment</> procedure is not allowed to post to a regulatory cost ...
F=105
& & sent sec. costs but did not receive any prim. costs
What causes this issue? In the current period &V1& &V2& has only creditorial <DS:GLOS.secondary_costs>secondary costs</> ...
Click on this link to search all SAP messages.