Do you have any question about this error?
Message type: E = Error
Message class: F= -
Message number: 059
Message text: Drill down preparation should always be done in productive mode
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
F=059
- Drill down preparation should always be done in productive mode ?The SAP error message "F=059 Drill down preparation should always be done in productive mode" typically occurs in the context of SAP reporting, particularly when using the drill-down reporting features in SAP BW (Business Warehouse) or SAP ERP systems. This error indicates that the drill-down preparation process is being attempted in a non-productive environment, which is not allowed.
Cause:
- Non-Productive Environment: The error usually arises when users attempt to perform drill-down reporting or preparation in a development or test environment instead of a production environment.
- System Configuration: The system may be configured to restrict certain operations to the production environment to ensure data integrity and performance.
- User Permissions: Users may not have the necessary permissions to perform drill-down operations in the current environment.
Solution:
- Switch to Productive Mode: Ensure that you are working in the production environment when attempting to perform drill-down preparations. If you are in a development or test environment, switch to the production system.
- Check User Permissions: Verify that you have the appropriate permissions to perform drill-down operations in the productive environment. If not, contact your system administrator to obtain the necessary access.
- Consult Documentation: Review SAP documentation or help resources related to drill-down reporting to ensure you are following the correct procedures.
- System Configuration Review: If you believe you should be able to perform this operation in a non-productive environment, consult with your SAP Basis or system administrator to review the system configuration and determine if any changes are needed.
Related Information:
By following these steps, you should be able to resolve the error and successfully perform drill-down preparations in the appropriate environment.
Get instant SAP help. Start your 7-day free trial now.
F=058
No traced costs postings to be done
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
F=057
Please assign a variance activity type to company code &
What causes this issue? You are executing the <DS:RE.FERCR030>variance allocation</> procedure but no activity type has been specified fo...
F=060
Please archive period &/& first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
F=061
Please prepare the drill down for period &/& first
What causes this issue? Before you can use the interactive drill down functionality for period &V1&/&V2&, you have to create necessar...
Click on this link to search all SAP messages.