How To Fix EPS269 - Error during determination of schedule record for line &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EPS - Payment Scheme

  • Message number: 269

  • Message text: Error during determination of schedule record for line &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EPS269 - Error during determination of schedule record for line &1 &2 ?
    The SAP error message EPS269, which states "Error during determination of schedule record for line &1 &2," typically occurs in the context of production planning or scheduling within SAP. This error indicates that the system encountered an issue while trying to determine the scheduling record for a specific line item in a production order or a related document.
    Causes:
    
    Missing or Incorrect Data: The scheduling record may not exist for the specified line item, or the data required to determine the schedule may be incomplete or incorrect.
    
    Configuration Issues: There may be configuration issues in the production planning settings, such as missing parameters or incorrect settings in the routing or work center. Master Data Issues: Problems with master data, such as missing or incorrect material master records, routing, or work center data, can lead to this error. System Bugs or Inconsistencies: Occasionally, bugs in the SAP system or inconsistencies in the database can cause this

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker