Message text: Error during determination of schedule record for line &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
EPS269
- Error during determination of schedule record for line &1 &2 ?The SAP error message EPS269, which states "Error during determination of schedule record for line &1 &2," typically occurs in the context of production planning or scheduling within SAP. This error indicates that the system encountered an issue while trying to determine the scheduling record for a specific line item in a production order or a related document.
Causes:
- Missing or Incorrect Data: The scheduling record may not exist for the specified line item, or the data required to determine the schedule may be incomplete or incorrect.
- Configuration Issues: There may be configuration issues in the production planning settings, such as missing parameters or incorrect settings in the routing or work center.
- Master Data Issues: Problems with master data, such as missing or incorrect material master records, routing, or work center data, can lead to this error.
- System Bugs or Inconsistencies: Occasionally, bugs in the SAP system or inconsistencies in the database can cause this error.
Solutions:
- Check Master Data: Verify that the material master, routing, and work center data are correctly maintained and that all necessary information is available.
- Review Configuration: Ensure that the configuration settings for production planning and scheduling are correctly set up. This includes checking the parameters for scheduling and the relevant planning strategies.
- Analyze the Line Item: Look at the specific line item referenced in the error message (indicated by &1 and &2) to see if there are any issues with it, such as missing components or incorrect settings.
- Check for Updates or Notes: Look for any SAP Notes or updates that may address this specific error. Sometimes, SAP releases patches or notes that resolve known issues.
- Debugging: If you have access to debugging tools, you can analyze the program logic to identify where the error is occurring and why the scheduling record cannot be determined.
- Consult SAP Support: If the issue persists and you cannot find a resolution, consider reaching out to SAP support for assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the EPS269 error and implement a solution.
Get instant SAP help. Start your 7-day free trial now.
EPS268
Error during determination of request periods from line &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EPS267
Error during adjustment of amount from line &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EPS270
No contract found for main selection criterion
What causes this issue? The system could not find any contracts and therefore also no payment schemes that fit the main selection criteria.System Res...
EPS271
No payment scheme found for additional selection criteria
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...