How To Fix EL213 - You have not specified scheduled MR cat. or use of MR cat. from sched.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EL - IS-U meter reading data processing

  • Message number: 213

  • Message text: You have not specified scheduled MR cat. or use of MR cat. from sched.

  • Show details Hide details
  • What causes this issue?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    Meter reading orders cannot be created.

    How to fix this error?

    Make an entry in one of the fields.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EL213 - You have not specified scheduled MR cat. or use of MR cat. from sched. ?

    The SAP error message EL213, which states "You have not specified scheduled MR cat. or use of MR cat. from sched.," typically occurs in the context of Material Requirements Planning (MRP) or when dealing with scheduling in SAP. This error indicates that the system requires a specific scheduling category for the material requirements, but it has not been provided.

    Cause:

    1. Missing Configuration: The scheduling category for the material might not be defined in the material master or in the relevant configuration settings.
    2. Incorrect MRP Settings: The MRP settings for the material may not be properly configured, leading to the absence of a scheduled MR category.
    3. User Input Error: The user may have failed to input the necessary information when creating or modifying the MRP parameters.

    Solution:

    1. Check Material Master Data:

      • Go to the material master record (transaction code MM03) and check the MRP views. Ensure that the scheduling category is specified correctly.
      • If the material is not set up for MRP, you may need to configure it accordingly.
    2. Review MRP Settings:

      • Check the MRP configuration settings in the system (transaction code OMD0 for MRP settings). Ensure that the scheduling categories are defined and linked to the relevant materials.
      • Verify that the MRP type is appropriate for the material and that it allows for scheduling.
    3. Input Required Data:

      • If you are running a transaction that requires input for scheduled MR categories, ensure that you provide the necessary information in the relevant fields.
    4. Consult Documentation:

      • Review SAP documentation or help files related to MRP and scheduling to understand the requirements for setting up scheduled MR categories.
    5. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support or your internal SAP team for further assistance.

    Related Information:

    • MRP Types: Understand the different MRP types (e.g., PD for MRP, VB for consumption-based planning) and how they affect scheduling.
    • Scheduling Categories: Familiarize yourself with the concept of scheduling categories in SAP and how they relate to production and procurement processes.
    • Transaction Codes: Common transaction codes related to MRP include:
      • MD01: MRP Run
      • MD02: MRP Run for Single Material
      • MD04: Stock/Requirements List
      • MM03: Display Material Master
      • OMD0: MRP Configuration

    By following these steps and understanding the underlying concepts, you should be able to resolve the EL213 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author