Message type: E = Error
Message class: EHPRC_CP01 - Messages BOMBOS Interface (1.2)
Message number: 109
Message text: &1 material &2; BOM transfer generation started
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message EHPRC_CP01109 typically relates to issues encountered during the transfer of Bill of Materials (BOM) data in the context of SAP's Engineering Change Management (ECM) or Product Lifecycle Management (PLM) modules. The message indicates that there is a problem with the generation of BOM transfer for a specific material.
Cause: The error can be caused by several factors, including but not limited to: Missing Data: Required data for the material or BOM may be missing or incomplete.
Configuration Issues: There may be configuration issues in the system that prevent the successful transfer of BOM data. Authorization Issues: The user may not have the necessary authorizations to perform the BOM transfer. Inconsistent Data: There may be inconsistencies in the data related to the material or BOM, such as incorrect status or versioning issues. System Errors: There could be underlying system errors or bugs that are causing the transfer process to fail.
Solution: To resolve the EHPRC_CP01109 error,
Get instant SAP help. Sign up for our Free Essentials Plan.
EHPRC_CP01108 &1 material &2; BOM already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EHPRC_CP01107 &1 material &2; FM interface for stop criteria is not correct (&3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EHPRC_CP01110 &1 material &2; BOM has not been changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EHPRC_CP01150 Error while creating new component for material &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.