Do you have any question about this error?
Message type: E = Error
Message class: EEWA_RCI - Messages for Enhanced Container Management
Message number: 057
Message text: Date cannot be changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
EEWA_RCI057
- Date cannot be changed ?The SAP error message EEWA_RCI057, which states "Date cannot be changed," typically occurs in the context of project management or resource planning within SAP systems, particularly when dealing with project dates, scheduling, or resource assignments. This error indicates that the system has restrictions preventing the modification of certain date fields.
Causes:
- Locked Dates: The date you are trying to change may be locked due to project status or settings that prevent modifications.
- Dependencies: There may be dependencies or constraints in the project that prevent changing the date (e.g., predecessor/successor relationships).
- Status of the Project: The project might be in a status that does not allow changes (e.g., completed or closed).
- Authorization Issues: The user may not have the necessary permissions to change the date.
- System Settings: Configuration settings in the project management module may restrict date changes.
Solutions:
- Check Project Status: Ensure that the project is not in a status that prohibits changes. If it is, you may need to change the status back to a modifiable state.
- Review Dependencies: Look for any dependencies or constraints that might be preventing the date change. Adjusting these may allow you to change the date.
- Authorization Check: Verify that you have the necessary permissions to make changes to the project dates. If not, contact your SAP administrator to obtain the required access.
- Consult Configuration: If you have access, check the configuration settings in the project management module to see if there are any restrictions on date changes.
- Use Transaction Codes: If applicable, use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to attempt the change in a different way or to gather more information about the project.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
EEWA_RCI056
Container with equipment number &1 already used in IBASE
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EEWA_RCI055
Container already removed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EEWA_RCI058
Container enhancement/replacement not possilbe
What causes this issue? You attempted to select a container for a delivery or replacement order. However, this container has already been provisional...
EEWA_RCI059
Container &1/&2 already provisionally allocated to container location &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.