Do you have any question about this error?
Message type: E = Error
Message class: EEDMIDEGRID - Grid Messages
Message number: 010
Message text: &1 does not belong to the settlement coordination service category
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
EEDMIDEGRID010
- &1 does not belong to the settlement coordination service category ?The SAP error message EEDMIDEGRID010 indicates that a specific entity (often a business partner, contract, or similar object) does not belong to the expected settlement coordination service category. This error typically arises in the context of SAP's Energy Data Management (EDM) or similar modules where settlement processes are involved.
Cause:
- Incorrect Configuration: The entity in question may not be properly configured to belong to the required service category. This could be due to missing or incorrect settings in the master data.
- Data Inconsistency: There may be inconsistencies in the data, such as the entity being assigned to a different category than expected.
- Business Logic: The business logic defined in the system may not recognize the entity as valid for the settlement coordination process.
Solution:
Check Configuration: Verify the configuration settings for the entity in question. Ensure that it is assigned to the correct settlement coordination service category.
- Navigate to the relevant configuration settings in SAP (e.g., customizing settings for EDM).
- Check the service category assignments for the entity.
Review Master Data: Inspect the master data of the entity to ensure it is complete and correctly categorized.
- Look for any missing fields or incorrect values that might lead to the error.
- Update the master data as necessary to align with the expected service category.
Consult Documentation: Refer to SAP documentation or notes related to the specific module you are working with. There may be specific guidelines or updates that address this error.
Testing: After making changes, perform tests to ensure that the error no longer occurs and that the settlement process can proceed as expected.
Contact Support: If the issue persists after checking configurations and master data, consider reaching out to SAP support for further assistance. Provide them with detailed information about the error and the steps you have taken.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
EEDMIDEGRID009
Allocate a distributor to the grid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EEDMIDEGRID008
Deletion not possible because grid &1 is used in a point of delivery
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EEDMIDEGRID011
Division of settlement coord. &1 not compatible with division of grid &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EEDMIDEGRID012
Grid level must be voltage level for electrcty division -> Entry too long
What causes this issue? The voltage level is a maximum of 2 bytes long (data element SPEBENE). The system issues an error message and will not allow ...
Click on this link to search all SAP messages.