Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix E9284 - No routes selected: Day capacity cannot be saved


E9284 - Overview

  • Message type: E = Error

  • Message class: E9 - General IS-U Error Messages

  • Message number: 284

  • Message text: No routes selected: Day capacity cannot be saved

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


E9284 - Details

  • The SAP error message E9284 "No routes selected: Day capacity cannot be saved" typically occurs in the context of capacity planning and scheduling within the SAP system, particularly in the Production Planning (PP) or Advanced Planning and Optimization (APO) modules. This error indicates that the system was unable to find any valid routes for the production process, which prevents the saving of day capacity.
    Causes:
    
    Missing or Incorrect Routing: The routing for the production order may not be defined correctly or may be missing entirely. This includes not having the necessary operations or sequences defined.
    Capacity Constraints: There may be capacity constraints that prevent the system from selecting any routes. This could be due to resource availability or scheduling conflicts.
    Incorrect Planning Parameters: The planning parameters or settings may not be configured correctly, leading to the system being unable to select a route.
    Material Master Issues: The material master data may not be set up

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


E9284 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant