Do you have any question about this error?
Message type: E = Error
Message class: E9 - General IS-U Error Messages
Message number: 284
Message text: No routes selected: Day capacity cannot be saved
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
E9284
- No routes selected: Day capacity cannot be saved ?The SAP error message E9284 "No routes selected: Day capacity cannot be saved" typically occurs in the context of capacity planning and scheduling within the SAP system, particularly in the Production Planning (PP) or Advanced Planning and Optimization (APO) modules. This error indicates that the system was unable to find any valid routes for the production process, which prevents the saving of day capacity.
Causes:
- Missing or Incorrect Routing: The routing for the production order may not be defined correctly or may be missing entirely. This includes not having the necessary operations or sequences defined.
- Capacity Constraints: There may be capacity constraints that prevent the system from selecting any routes. This could be due to resource availability or scheduling conflicts.
- Incorrect Planning Parameters: The planning parameters or settings may not be configured correctly, leading to the system being unable to select a route.
- Material Master Issues: The material master data may not be set up correctly, particularly in relation to the production process and routing.
- Date and Time Settings: The date and time settings for the production order may not align with the available capacity or routing.
Solutions:
- Check Routing: Verify that the routing for the relevant material is correctly defined in the system. Ensure that all necessary operations and sequences are included.
- Review Capacity Planning: Check the capacity planning settings and ensure that the resources are available and not overloaded. Adjust the capacity if necessary.
- Validate Material Master Data: Ensure that the material master data is complete and correctly configured, particularly the production-related views.
- Adjust Planning Parameters: Review and adjust the planning parameters in the configuration settings to ensure they align with the production requirements.
- Check Dates: Ensure that the dates set for the production order are valid and that they correspond with the available capacity in the system.
Related Information:
CO01
(Create Production Order), CO02
(Change Production Order), or C223
(Maintain Routing) to check and modify the relevant data.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant module.
Get instant SAP help. Start your 7-day free trial now.
E9283
Capacity already scheduled: no changes possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
E9282
Choose a capacity entry from the table
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
E9285
Material with SA &1 does not correspond to SA for day capacity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
E9286
Material &1 with SA &2 not assigned to day capacity
What causes this issue? The service area of the material does not match the service area of the day capacity.System Response The system issues an er...
Click on this link to search all SAP messages.