How To Fix E9281 - Posting not possible; capacity allocation missing for material &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: E9 - General IS-U Error Messages

  • Message number: 281

  • Message text: Posting not possible; capacity allocation missing for material &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message E9281 - Posting not possible; capacity allocation missing for material &1 ?

    The SAP error message E9281, "Posting not possible; capacity allocation missing for material &1," typically occurs in the context of production planning and capacity management. This error indicates that there is no capacity allocation defined for the specified material, which prevents the system from processing certain transactions, such as production orders or confirmations.

    Cause:

    1. Missing Capacity Allocation: The primary cause of this error is that there is no capacity allocation defined for the material in question. This can happen if the material has not been assigned to a work center or if the capacity planning settings are not properly configured.
    2. Incorrect Configuration: The work center may not be set up correctly, or the routing for the material may not include the necessary operations that require capacity allocation.
    3. Material Master Data Issues: The material master data may be incomplete or incorrectly configured, particularly in the areas related to production and capacity planning.
    4. Production Version Issues: If the production version is not correctly assigned or if it does not have the necessary capacity allocation, this error can occur.

    Solution:

    1. Check Capacity Allocation:

      • Go to the work center associated with the material and verify that the capacity allocation is defined.
      • Ensure that the work center has the necessary capacity settings and that it is assigned to the correct production line or area.
    2. Review Material Master Data:

      • Check the material master data for the material in question. Ensure that the relevant views (such as MRP, Work Scheduling, and Production) are properly maintained.
      • Make sure that the material is assigned to the correct work center and that the production version is set up correctly.
    3. Check Routing:

      • Review the routing for the material to ensure that it includes the necessary operations and that each operation is linked to a work center with capacity allocation.
      • If necessary, update the routing to include the correct work center and operations.
    4. Production Version:

      • Ensure that the production version for the material is correctly defined and that it includes the necessary work center and routing information.
    5. Capacity Planning Settings:

      • Review the capacity planning settings in the system to ensure that they are configured correctly for the relevant materials and work centers.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CR01 (Create Work Center), CR02 (Change Work Center), C202 (Change Routing), and MM02 (Change Material) to make the necessary adjustments.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to capacity allocation and this error message.
    • Documentation: Refer to SAP documentation on capacity planning and production order processing for more detailed guidance on configuration and troubleshooting.

    By following these steps, you should be able to resolve the E9281 error and ensure that capacity allocation is properly set up for the material in question.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant