How To Fix DRCT_ACTY_ALLOCATION009 - You've activated project billing, so WBS Element (&1) isn't allowed.


DRCT_ACTY_ALLOCATION009 - Overview

  • Message type: E = Error

  • Message class: DRCT_ACTY_ALLOCATION -

  • Message number: 009

  • Message text: You've activated project billing, so WBS Element (&1) isn't allowed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DRCT_ACTY_ALLOCATION009 - You've activated project billing, so WBS Element (&1) isn't allowed. ?
    The SAP error message DRCT_ACTY_ALLOCATION009 indicates that you have activated project billing for a specific Work Breakdown Structure (WBS) element, which is not allowed for the current operation you are trying to perform. This typically occurs when you attempt to allocate costs or perform certain activities on a WBS element that has billing activated, but the system settings or the context of the operation do not permit it.
    
    Cause: Project Billing Activation: The WBS element has project billing activated, which means it is set up to handle billing processes. Certain operations, such as direct activity allocation, may not be compatible with this setting. Configuration Settings: The configuration settings in the project system may restrict certain types of cost allocations or activities for WBS elements that are set up for billing. Incorrect Transaction: You may be using a transaction or process that is not compatible with WBS elements that have billing activated.
    Solution: Review WBS Element Settings:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker