Message type: E = Error
Message class: DPR_SHARED - Development Projects: Messages for Shared Objects
Message number: 807
Message text: Could not lock all phases: Deletion is not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_SHARED807
- Could not lock all phases: Deletion is not possible ?The SAP error message DPR_SHARED807 indicates that a deletion operation could not be completed because not all phases of the project could be locked. This typically occurs in the context of project management within SAP, particularly when dealing with project structures in the SAP Project System (PS) or SAP Portfolio and Project Management (PPM).
Cause:
- Concurrent Access: Another user or process is currently accessing or modifying the project or its phases, preventing the system from obtaining the necessary locks.
- Lock Table Issues: The lock table may be full or experiencing issues, which can prevent new locks from being acquired.
- Incomplete Phase Locking: The system may not be able to lock all the required phases due to their current status or configuration.
- Authorization Issues: The user may not have the necessary authorizations to delete certain phases or elements of the project.
Solution:
- Check for Concurrent Users: Verify if other users are currently working on the same project or phases. If so, coordinate with them to ensure that they release their locks.
- Wait and Retry: Sometimes, simply waiting for a few moments and then retrying the deletion can resolve the issue if it was caused by temporary locks.
- Check Lock Entries: Use transaction code SM12 to check for existing lock entries. If you find locks that are no longer needed, you may be able to delete them (ensure you have the necessary authorizations to do so).
- Review Project Structure: Ensure that all phases and elements of the project are in a state that allows for deletion. If any phase is in a locked or completed state, it may need to be unlocked or modified before deletion can proceed.
- Authorization Check: Ensure that the user attempting the deletion has the necessary authorizations to perform the action on all phases of the project.
- System Logs: Check system logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
If the issue persists after trying the above solutions, it may be necessary to consult with your SAP Basis team or SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
DPR_SHARED806
Could not lock all phases; scheduling is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_SHARED805
System cannot lock phase &1
What causes this issue? You are editing the project definition in change mode but the system cannot lock phase &V1& at present.System Respons...
DPR_SHARED808
Could not lock all objects for project: &1 is not possible
What causes this issue? You want to perform action &V1& for the project definition. Since this action affects the whole project, all subtasks...
DPR_SHARED809
System could not lock approval of phase: &1 is not possible
What causes this issue? You want to perform action &V1& for the phase. This action also affects the approval of the phase. However, the appro...
Click on this link to search all SAP messages.