How To Fix DPR_PROJ_INTEGRATION512 - Checklist data for checklist &1 changed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 512

  • Message text: Checklist data for checklist &1 changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION512 - Checklist data for checklist &1 changed ?

    The SAP error message DPR_PROJ_INTEGRATION512, which states "Checklist data for checklist &1 changed," typically occurs in the context of project management within SAP, particularly when dealing with checklists in the Project System (PS) or Project Management (PM) modules. This error indicates that there has been a change in the checklist data that is being referenced, which can lead to inconsistencies or issues when trying to process or save project-related data.

    Cause:

    1. Concurrent Changes: The checklist data may have been modified by another user or process while you were trying to access or save it.
    2. Data Locking: The checklist might be locked for editing by another transaction or user, leading to a conflict when you attempt to save your changes.
    3. System Updates: Changes in the underlying data structure or configuration in the SAP system could also lead to this error.
    4. Inconsistent Data: There may be inconsistencies in the checklist data that need to be resolved before proceeding.

    Solution:

    1. Refresh the Data: Try refreshing the checklist data to ensure you are working with the most current version. This can often be done by navigating away from the checklist and returning to it.
    2. Check for Locks: Use transaction codes like SM12 to check for any locks on the checklist data. If you find any locks, you may need to wait for the other user to finish or contact them to resolve the issue.
    3. Reopen the Checklist: Close the checklist and reopen it to see if the error persists. This can help in reloading the data.
    4. Review Changes: If you have access, review the change logs or history for the checklist to understand what changes were made and by whom.
    5. Consult Documentation: Check SAP notes or documentation related to this specific error message for any known issues or patches that may address the problem.
    6. Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting SAP's support portal for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and others that may be related to project management and checklists.
    • SAP Notes: Search for SAP Notes related to DPR_PROJ_INTEGRATION512 for any specific fixes or updates that may be applicable.
    • User Permissions: Ensure that you have the necessary permissions to access and modify the checklist data, as insufficient permissions can also lead to errors.

    By following these steps, you should be able to diagnose and resolve the issue related to the DPR_PROJ_INTEGRATION512 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker