How To Fix DPR_PROJ_INTEGRATION238 - Project &1 exported to MSPS 03 system &2


DPR_PROJ_INTEGRATION238 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 238

  • Message text: Project &1 exported to MSPS 03 system &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION238 - Project &1 exported to MSPS 03 system &2 ?
    The SAP error message DPR_PROJ_INTEGRATION238 indicates an issue related to the integration of SAP Project Management with Microsoft Project Server (MSPS). Specifically, this error occurs when there is a problem exporting a project from SAP to the MSPS system.
    
    Cause: The error can be caused by several factors, including but not limited to: Data Inconsistencies: There may be inconsistencies or missing data in the project that prevent it from being exported successfully.
    Configuration Issues: The integration settings between SAP and MSPS may not be configured correctly. Authorization Problems: The user attempting the export may not have the necessary permissions to perform the operation. Version Compatibility: There may be compatibility issues between the versions of SAP and MSPS being used. Network Issues: Connectivity problems between the SAP system and the MSPS can also lead to this error.
    Solution: To resolve the DPR_PROJ_INTEGRATION238 error, you can take the following steps: Check Project Data: Review the project data in SAP for any inconsistencies

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant