How To Fix DPR_PROJ_INTEGRATION218 - Assignment &1 &2 &3 was deleted in base project system


DPR_PROJ_INTEGRATION218 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 218

  • Message text: Assignment &1 &2 &3 was deleted in base project system

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION218 - Assignment &1 &2 &3 was deleted in base project system ?
    The SAP error message DPR_PROJ_INTEGRATION218 indicates that an assignment (such as a work package, task, or resource) has been deleted in the base project system, which is causing issues in the Project Management (DPR) module. This error typically arises when there is a mismatch or inconsistency between the project data in the Project System (PS) and the Project Management (DPR) module.
    
    Cause: Deletion in Base Project System: The most common cause is that an assignment (like a work package or task) was deleted in the base project system (PS) after it was already integrated into the DPR module. Data Synchronization Issues: There may be synchronization issues between the PS and DPR modules, leading to inconsistencies in the project data. Manual Changes: Manual changes made to the project structure or assignments in the PS without corresponding updates in the DPR module can also lead to this error.
    Solution: Check Deletion: Verify if the assignment mentioned in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant