How To Fix DPR_PROJ_INTEGRATION206 - Project &1 is already linked to a different base project


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 206

  • Message text: Project &1 is already linked to a different base project

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION206 - Project &1 is already linked to a different base project ?

    The SAP error message DPR_PROJ_INTEGRATION206 indicates that a project you are trying to link to a base project is already associated with a different base project. This typically occurs in the context of project management within SAP, particularly when using the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules.

    Cause:

    1. Existing Link: The project you are trying to link (let's call it Project A) is already linked to another base project (Project B). SAP does not allow a project to be linked to multiple base projects simultaneously.
    2. Data Integrity: This restriction is in place to maintain data integrity and ensure that project structures are clear and unambiguous.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Existing Links:

      • Navigate to the project in question and check its current base project link. You can do this by using transaction codes like CJ20N (Project Builder) or DPR_PROJECT (Project Management).
      • Identify the base project that Project A is currently linked to.
    2. Decide on the Action:

      • If you need to link Project A to a new base project, you will first need to unlink it from the existing base project. This can usually be done in the project management interface.
      • If the existing link is still valid and you do not want to change it, you will need to link the new project to a different project that is not already linked.
    3. Unlinking the Project:

      • To unlink, go to the project details and remove the link to the current base project. Ensure that this action aligns with your project management strategy and does not disrupt any ongoing processes.
    4. Re-linking:

      • After unlinking, you can attempt to link Project A to the desired base project again.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N, CJ02 (Change Project), and DPR_PROJECT for managing projects.
    • Documentation: Review SAP documentation or help files related to project management to understand the implications of linking and unlinking projects.
    • User Permissions: Ensure that you have the necessary permissions to make changes to project links, as restrictions may apply based on user roles.
    • Consult with Team: If you are unsure about the implications of unlinking a project, consult with your project management team or SAP administrator.

    By following these steps, you should be able to resolve the DPR_PROJ_INTEGRATION206 error and manage your project links effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant