Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix DPR_PROJ_INTEGRATION135 - Enter Portf. Mgmt project ID for PS project definition &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 135

  • Message text: Enter Portf. Mgmt project ID for PS project definition &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION135 - Enter Portf. Mgmt project ID for PS project definition &1 ?

    The SAP error message DPR_PROJ_INTEGRATION135 indicates that there is a missing or incorrect Portfolio Management (PM) project ID associated with a Project System (PS) project definition. This error typically arises when trying to integrate or link a PS project with a Portfolio Management project, and the system requires a valid PM project ID to proceed.

    Cause:

    1. Missing PM Project ID: The PS project definition does not have an associated Portfolio Management project ID.
    2. Incorrect Configuration: The integration settings between the Project System and Portfolio Management may not be correctly configured.
    3. Data Inconsistency: There may be inconsistencies in the data between the PS and PM modules, such as missing entries or incorrect mappings.

    Solution:

    1. Check Project Definition: Verify that the PS project definition has a valid Portfolio Management project ID assigned. You can do this by navigating to the project definition in the Project System and checking the integration settings.

    2. Assign PM Project ID: If the PM project ID is missing, you can assign it by:

      • Going to the relevant transaction (e.g., CJ20N for Project Builder).
      • Selecting the project and navigating to the "Integration" tab.
      • Entering the correct PM project ID.
    3. Review Integration Settings: Ensure that the integration settings between the PS and PM modules are correctly configured. This may involve checking the customizing settings in the SAP system.

    4. Data Consistency Check: Run consistency checks to identify any discrepancies between the PS and PM data. This can help in identifying any missing or incorrect entries.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the integration between PS and PM, as well as any prerequisites that need to be fulfilled.

    6. Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP experts for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ01 (Create Work Breakdown Structure), and CJI3 (Project Actual Cost Line Items) for managing projects.
    • SAP Notes: Check for any SAP Notes related to this error message for potential bug fixes or patches.
    • User Roles: Ensure that the user has the necessary authorizations to view and edit project definitions in both PS and PM modules.

    By following these steps, you should be able to resolve the DPR_PROJ_INTEGRATION135 error and successfully integrate your PS project with the Portfolio Management project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker